Requests For Quote

  • Project Name
    Falcon Ridge Capacitor Project
    Project Bid Close Date
    2026-12-02
    Project Documents
    FAQ
    • Question: 1. Are the capacitor support structures developed by the manufacturer or are they in the scope of the structural engineer?
      Answer: The support structures will be developed by the manufacturer, but the foundations will be coordinated with the manufacturer and the structural /civil engineer.
    • Question: 2. Is the control logic in the scope of the electrical engineer or the manufacturer?
      Answer: The control logic will be in the electrical engineer’s scope.
    • Question: 3. For the engineering contractor, are we assuming we will only have to provide a points list and OPD5 will modify the RTU configuration file(s) accordingly?
      Answer: Contractor is only responsible for the points list, OPD will program the RTU.